Reconstruction of the Bridge over the Pēterupe River in Saulkrasti Municipality
14/05/2025
In this project, the dismantling and disposal of the bridge span and supports will be carried out. A new support structure and reinforced concrete span will be constructed. New transition slabs, railings, and an asphalt concrete road surface will be installed. Landscaping works will also be performed.
