Railway Platform Infrastructure Development
14/07/2023
As part of the project, utility networks and street lighting systems were constructed.
ELT protective conduits and ELT cable networks were installed with a total length of 3,600 meters.
Fifteen manholes were installed.
A total of 50 lighting poles and 85 road sign posts were erected.
The project concluded with the installation of a paving stone surface.
