Construction of Utility Networks and Modular Buildings
02/05/2024
As part of this project, sewerage networks (D110–D200), water supply lines (D25–D250), a stormwater drainage system, and a fire-fighting system – from water tanks to hydrant points – were constructed. The total length of the installed utility networks reached 1,100 meters.
In addition, factory-produced container modules were installed for various types of buildings. The structures were made of sandwich-type panels and equipped with doors and windows. The completed buildings consisted of several dozen containers.
