Construction of Foundation Piles for a High-Voltage Power Line
As part of this project, foundations were constructed for a new high-voltage power line route.
Our task was to build support piles in two ways:
-
Precast foundations, where reinforced concrete elements (columns, bases, etc.) were manufactured in the factory and assembled on-site.
-
Cast-in-place foundations, which were constructed on-site by excavating a pit, laying a crushed stone layer, binding the reinforcement, installing formwork, and pouring concrete.
The works were carried out under various conditions – both in dry areas and in marshy zones, where special equipment access was required.
Additionally, retaining walls and dewatering equipment were used.