Construction of Foundation Piles for a High-Voltage Power Line

11/08/2017

As part of this project, foundations were constructed for a new high-voltage power line route.

Our task was to build support piles in two ways:

  • Precast foundations, where reinforced concrete elements (columns, bases, etc.) were manufactured in the factory and assembled on-site.

  • Cast-in-place foundations, which were constructed on-site by excavating a pit, laying a crushed stone layer, binding the reinforcement, installing formwork, and pouring concrete.

The works were carried out under various conditions – both in dry areas and in marshy zones, where special equipment access was required.

Additionally, retaining walls and dewatering equipment were used.